As we decided to use a Clipsal C-Bus system for our lighting, Homestead allowed us to organise a meeting with the contracted electrician for our site.
We were introduced to Steve from Lidd Electrical to assist us with any specifications other than the standard allowance, so that cabling could suit C-Bus.
We went to the meeting quite prepared and with a strong understanding of C-Bus. We had a rough lighting plan (below), as well as an associated spreadsheet containing group addresses, cable run from C-Bus cabinet to load, plus allowance for lighting load circuit (e.g. extra cable length for down light installation post handover). Steve took a pragmatic view and was able to price the gaps (compared to the standard Homestead contract) required for installing the 240v portion of the installation.
The design of our system involves 4x 8 channel dimmer packs and 1x 12 channel relay module.
![]() | ||