Tuesday, 4 November 2014

Frame update, window delivery and perimeter Termimesh

A big last few days with most of the framing complete, a delivery of our windows, sliding doors and exterior door frames and installation of Termimesh perimeter protection.


Termimesh perimeter stainless mesh ready for first course of bricks


Installation of the living area/hallway cavity sliding door

Rear of property with almost complete roof structure

Lachie looking at our front door frame


Windows and door frames

Windows and sliding doors

Sliding door handles


Framing update from bedroom 1

Framing update

Gas fitter set up to fit pipes

Gas entry for oven

Monday, 3 November 2014

Beware of minor alterations!

Upon further framing, we realised the heated towel rail we wanted to install in the ensuite would be difficult to install on the designated wall.  This is due to the cavity slider void behind the wall and the structure not providing sufficient room for fixings.
Unfortunately as the towel rail is in the grey area that the Homestead electrician is going to install within the Homestead contract, but as part of a 'C-Bus' line in our contract, the construction department doesn't want to get involved.  Our site supervisor advised that he would not recommend installing on the cavity slider wall.
This has left us in the difficult position of trying to finding a solution for a problem we didn't anticipate.  We can either (a) use a narrow towel rail in the very corner of the ensuite which is not optimal based on the position of the shower, or (b) request a change to the sliding door position.  My wife and I found a compromise that we could position the slider on the wall of the WIR instead (as per diagram below).  This would solve the problem of installing the towel rail, as it could be installed anywhere along the length of the wall.
This seemed like a very straightforward change (the two walls basically swap with each other), however once approaching Homestead, a small change quickly snowballed into an impossible task - initially any change was immediately shut down due to affecting Homestead's trades and associated planning. After explaining the simplicity of the change, we did get some detail from Homestead that it was likely they could do it, but would be very expensive, as it would involve:
  1. the engineers to evaluate the change and re-draw the appropriate plan (all non load bearing walls, however a small lintel above the slider)
  2. the private certifiers to review the changes
  3. submission of the change to council
  4. re-communication to all Homestead trades affected.
What seemed like a small change was quickly dismissed by us due to the significant costs associated with each stage.
We appreciate our site supervisor's effort to achieve the outcome for our home, but we can't help but feel disappointed of the outcome.


Wednesday, 29 October 2014

Roof Trusses

Our trusses delivery mostly occurred on Saturday, with the remaining arriving on Monday morning.  Unfortunately Monday was too windy to complete the job, as was Tuesday.  Wednesday saw the crane in action and our home continued to grow!  Exciting to see the shape and size of the rooms.

Truss delivery

Removing a pack of trusses from truck

Trusses stacked on property ready for installation

Crane lowering truss into place

Crane lowering truss into place

Entry hallway with 3000mm truss cut-outs

Living area

Towards kitchen and meals area

Roof shape from rear of house

Roof shape from rear of house

Waste water connection

Quite a big day on site today with the crane for trusses (more on that in the next blog post), as well as SA Water crew to install our waste water connection.

Where did the SA Water man go?  The sewer main was at least 2400mm deep

Lachie in toddler heaven

Friday, 24 October 2014

Framing Update

Most of the framing was completed by end of Thursday.  Jason mentioned the roof trusses would likely be delivered on Friday, ready for lifting with crane on Monday.  They are also waiting on a supply of wall studs for the garage, as there was not sufficient amounts supplied for the job.

My father-in-law and I gave the carpenters a hand to lift the alfresco laminated and solid timber beams into place as they were incredibly heavy!

Framing from front of property - garage still to be framed

Is there a secret doorway between the two bedrooms?

Hallway - all frame work is straight as an arrow!

Alfresco and kitchen/living

Frame from rear of property

Monday, 20 October 2014

Framing

Framing has begun!  Very exciting to see the house start to take shape vertically.  The two guys working on the site seem great and happy to have a chat.  Very happy to see the details discussed with Homestead (including the stud positioning in the WIP for data cabinets) on their radar.

Our oldest son will be excited to see his room is the first one to be built!

Bedroom 4 from rear of house

Still a lot of walls!

Hard at work

Monday, 13 October 2014

Wood delivered

The wood for our frame was delivered today.  The carpenters scheduled to start on the site within the next few days.  The roof trusses are scheduled for 16/Oct.